Remote and integrated network management of the various facilities
La Giocomotiva needed to implement a high-performance network that can be easily managed remotely for all the different facilities located throughout Italy.
High-performance and easily managed remote Wi-Fi for all the hotels in the chain
The Sina Hotels chain needed to upgrade its network infrastructure in order to update the Wi-Fi service.
FEMW Irlandesas El Soto school (Madrid)
has gained recognition from the Google Reference School Network, thanks to the digitisation of its classrooms and educational platforms, which are supported by modern network infrastructure with Wireless and D-Link Switching solutions that have been installed by its partner Egson
Colegio FEMW Irlandesas Madrid
Modern digitalisation of its classrooms and educational platforms, thanks to the deployment of D-Link’s Wireless and Switching solutions, with unified management from the free Nuclias Connect software
MVZ “Im Altstadtquartier” relies on a highperformance network
Together with Pätzold Datentechnik and network components from D-Link, the symbiosis of medical systems and modern IT succeeded
The Saint-François-Xavier Academic Grouping relies on Nuclias Cloud for Wi-Fi infrastructure redesign
In 2019, management decided to carry out an IT audit to modernise an outdated, disparate network infrastructure, which is characterised by numerous slowdowns.
Upgraded wireless and video surveillance systems within EHPAD retirement home facilities
With the health crisis, EHPADs are speeding up their digital transformation to make everyday life easier for staff and keep residents in touch with their families.
The Pays de la Loire Football League upgrades to Wi-Fi 6 with Nuclias Cloud Access Points
The objective: to roll out a high-performance solution to take current usage into account while integrating future requirements and providing new guarantees in terms of security.
ADR logistics GLC Providing full wireless coverage without any outage
D-Link staff made a pilot system to migrate the existing configuration into the new system where the Customer made a lot of compatibility tests.